24/09/2021 - Delivering the Bee Network: Autumn Overview ref: 964    Recommendations Approved

Decision Maker: Greater Manchester Combined Authority

Made at meeting: 24/09/2021 - Greater Manchester Combined Authority

Decision published: 28/09/2021

Effective from: 24/09/2021

Decision:

That progress in delivering the Bee Network be noted.


24/09/2021 - Streets for All Strategy ref: 967    Recommendations Approved

Decision Maker: Greater Manchester Combined Authority

Made at meeting: 24/09/2021 - Greater Manchester Combined Authority

Decision published: 28/09/2021

Effective from: 24/09/2021

Decision:

1.              That the Streets for All Strategy be approved and adopted, subject to the approval of Manchester City Council’s Executive Committee and the strengthening of the Strategy to reflect the earlier agreed Gender Based Violence Strategy, emphasising safety, as a priority objective, throughout the Strategy.

 

2.       That integral role of an integrated, affordable public transport system to growing the economy, providing access to education and employment be recognised.

 


24/09/2021 - GM Investment Framework, Conditional Project Approval ref: 971    Recommendations Approved

Decision Maker: Greater Manchester Combined Authority

Made at meeting: 24/09/2021 - Greater Manchester Combined Authority

Decision published: 28/09/2021

Effective from: 24/09/2021


24/09/2021 - Exclusion of the Press and Public ref: 970    Recommendations Approved

Decision Maker: Greater Manchester Combined Authority

Made at meeting: 24/09/2021 - Greater Manchester Combined Authority

Decision published: 28/09/2021

Effective from: 24/09/2021

Decision:

That, under section 100 (A)(4) of the Local Government Act 1972 the press and public should be excluded from the meeting for the following items on business on the grounds that this involved the likely disclosure of exempt information, as set out in the relevant paragraphs of Part 1, Schedule 12A of the Local Government Act 1972 and that the public interest in maintaining the exemption outweighed the public interest in disclosing the information.

 


24/09/2021 - GM Investment Framework, Conditional Project Approval ref: 963    Recommendations Approved

Decision Maker: Greater Manchester Combined Authority

Made at meeting: 24/09/2021 - Greater Manchester Combined Authority

Decision published: 28/09/2021

Effective from: 24/09/2021

Decision:

1.           That an investment of £10m into a second Life Sciences Fund be approved.

 

2.           That authority be delegated to the GMCA Treasurer and Monitoring Officer to review the due diligence information in respect of the above company, and, subject to their satisfactory review and agreement of the due diligence information and the overall detailed commercial terms of the investment, to sign off any outstanding conditions, issue final approvals and complete any necessary related documentation in respect of the investment noted above.

 


24/09/2021 - GM Housing Investment Loans Fund: Update ref: 962    Recommendations Approved

Decision Maker: Greater Manchester Combined Authority

Made at meeting: 24/09/2021 - Greater Manchester Combined Authority

Decision published: 28/09/2021

Effective from: 24/09/2021

Decision:

1.        That the contents of this report be noted.

 

2.        That a presentation on how the flexible use of the financial instruments has impacted housing, creation and access to training and employment and the wider regeneration be submitted to the next meeting of the GMCA.

 


24/09/2021 - GMCA, Environment Agency and United Utilities Memorandum of Understanding ref: 960    Recommendations Approved

Decision Maker: Greater Manchester Combined Authority

Made at meeting: 24/09/2021 - Greater Manchester Combined Authority

Decision published: 28/09/2021

Effective from: 24/09/2021

Decision:

1.           That it be agreed that the GMCA will enter into a memorandum of understanding with the Environment Agency and United Utilities.

 

2.           That the common areas of interest and outcomes be noted (para 3.4 and Appendix B of the report).

 

3.           That it be agreed that the GMCA will receive an annual report on progress, success and any issues/barriers to delivery.

 


24/09/2021 - Greater Manchester Economic Dashboard ref: 959    Recommendations Approved

Decision Maker: Greater Manchester Combined Authority

Made at meeting: 24/09/2021 - Greater Manchester Combined Authority

Decision published: 28/09/2021

Effective from: 24/09/2021

Decision:

That the latest update of the Greater Manchester Economic Resilience Dashboard and response be noted, including delivery of the Local Industrial Strategy and Greater Manchester Economic Vision.

 


24/09/2021 - Refresh of Greater Manchester VCSE Accord ref: 958    Recommendations Approved

Decision Maker: Greater Manchester Combined Authority

Made at meeting: 24/09/2021 - Greater Manchester Combined Authority

Decision published: 28/09/2021

Effective from: 24/09/2021

Decision:

1.            That the new GM VCSE Accord be approved, as a tri-partite Agreement with the GM Health and Social Care Partnership and the GM VCSE Leadership Group on behalf of the VCSE sector in Greater Manchester. 

 

2.            That the Mayor of Greater Manchester, the GM Portfolio Lead forCommunity, Co-operatives, Voluntary Sector and Inclusion and the Chief Executive Officer, GMCA & TfGM be authorised to sign the Accord Agreement on their behalf.

 

3.            That the Accord be referred for recommendation to each GM Local Authority, in recognition that a number of elements within the Accord were to be delivered by Local Authorities.

 


24/09/2021 - Sustainable Warmth Competition ref: 961    Recommendations Approved

Decision Maker: Greater Manchester Combined Authority

Made at meeting: 24/09/2021 - Greater Manchester Combined Authority

Decision published: 28/09/2021

Effective from: 24/09/2021

Decision:

1.        That it be agreed that GM Local Authorities should collectively bid for c£15m of Sustainable Warmth Competition funding, to continue the existing Green Homes Grant funded retrofit programme from December 2021 to March 2023.

 

2.        That it be agreed that the GMCA should be the accountable body for the bid on behalf of GM Local Authorities and Registered Providers.

 

3.        That, subject to a successful award, authority be delegated to the GMCA Treasurer and Monitoring Officer to contract with BEIS to receive and defray the funds to partners and procured delivery partner(s).

 

4.        That it be noted that the equalities impact from this proposal will be managed via utilising delivery companies with robust equality policies, and the environmental outcome was to substantially reduce the carbon emissions from approximately 1200 homes in Greater Manchester.

 


24/09/2021 - Bus Reform: The Greater Manchester Franchising Scheme for Buses 2021 -Transfer of Undertakings (Protection of Employment) Regulations 2006 and Employee Related Information ref: 968    Recommendations Approved

Decision Maker: Greater Manchester Combined Authority

Made at meeting: 24/09/2021 - Greater Manchester Combined Authority

Decision published: 28/09/2021

Effective from: 24/09/2021

Decision:

1.            That the contents of the report be noted.

2.            That the function of requesting relevant information from bus operators as set out in regulations 5 and 6 of the Franchising Schemes and Enhanced Partnership Schemes (Application of TUPE) (England) Regulations 2017 (the Regulations) be delegated to TfGM.

3.            That the function of undertaking any consultations as required by the Regulations be delegated to TfGM.

4.            That authority be delegated to the Chief Executive Officer, GMCA & TfGM to approve any proposed definition of ‘principally connected’ at the end of the consultation; such approval to be obtained before notifying the parties and publishing the agreement.

5.            That authority be delegated to the Chief Executive Officer, GMCA & TfGM, to approve the proposed allocation arrangements (including any revised allocation arrangements) at the end of the consultation; such approval to be obtained before notifying the parties and before the allocation arrangements are published (or finalised and published in the case of revised allocation arrangements).

6.            That, in the event that agreement is reached as to the definition of ‘principally connected’, that the function of notifying the parties and publishing the agreed definition be delegated to TfGM.

7.            That the function of notifying the parties and publishing the allocation arrangements and finalising and publishing any revised allocation arrangements be delegated to TfGM.


24/09/2021 - Greater Manchester Electric Vehicle Charging Infrastructure Strategy ref: 969    Recommendations Approved

Decision Maker: Greater Manchester Combined Authority

Made at meeting: 24/09/2021 - Greater Manchester Combined Authority

Decision published: 28/09/2021

Effective from: 24/09/2021

Decision:

1.           That the Greater Manchester Electric Vehicle Charging Infrastructure Strategy be approved.

 

2.           That it be noted that regular reports on progress against the Strategy be submitted to the GMCA.

 

3.           That it be noted that the programme of planned publicly funded additional Electric Vehicle Infrastructure is included at electrictravel.tfgm.com, a sub-site of TfGM.com.

 


24/09/2021 - GM Cycle Hire Tariff Proposal ref: 965    Recommendations Approved

Decision Maker: Greater Manchester Combined Authority

Made at meeting: 24/09/2021 - Greater Manchester Combined Authority

Decision published: 28/09/2021

Effective from: 24/09/2021

Decision:

1.            That the proposals contained within the report be noted.

 

2.            That the initial Pay as Your Ride tariff proposal, as set out in section 2 of the report, be approved.


24/09/2021 - The Mayor's Cycling and Walking Challenge Fund and Active Travel Fund ref: 966    Recommendations Approved

Decision Maker: Greater Manchester Combined Authority

Made at meeting: 24/09/2021 - Greater Manchester Combined Authority

Decision published: 28/09/2021

Effective from: 24/09/2021

Decision:

1.           That the release of up to £1.3 million of development cost funding for the 2 MCF schemes,Rochdale Castleton (Phase 2) and Trafford North Altrincham Bee Network set out in section 2 of the report, be approved.

 

2.           That the release of up to £7.24 million MCF funding for the 6 schemes, Metrolink (Bury Line) Cycle Parking, Wigan Leigh-Atherton-Tyldsley: Leigh to Pennington, Manchester Northern Quarter Areas 1 and 3, Salford Trinity Way / Springfield Lane and Salford Gore Street Connection, as set out in section 3 of the report be approved, in order to secure full approval and enable the signing of the necessary legal agreements.

 

3.           That an evaluation of the pilot to allow bikes on Metrolink be submitted to the GMCA in due course.


24/09/2021 - Tackling Inequality in Greater Manchester - Response to the reports of Independent Inequalities Commission and Marmot 'Build Back Fairer' ref: 957    Recommendations Approved

Decision Maker: Greater Manchester Combined Authority

Made at meeting: 24/09/2021 - Greater Manchester Combined Authority

Decision published: 28/09/2021

Effective from: 24/09/2021

Decision:

1.            That the activities and planned activities taking place across Greater Manchester, across a range of localities, communities and institutions, in relation to the refreshed Greater Manchester Strategy be noted.

 

2.            That the timeframe and urgency for acting on inequality, and the intention to quickly progress actions across all portfolios in the coming months be noted. 

 


24/09/2021 - Greater Manchester Gender-Based Violence Strategy ref: 956    Recommendations Approved

Decision Maker: Greater Manchester Combined Authority

Made at meeting: 24/09/2021 - Greater Manchester Combined Authority

Decision published: 28/09/2021

Effective from: 24/09/2021

Decision:

1.            That the Gender Based Violence Strategy be approved for publication and delivery.

 

2.            That the establishment of a public campaign to promote the Gender Based Violence Strategy be endorsed and that all boys and men be urged to take responsibility for their actions and to take a stand against gender-based violence.

 


24/09/2021 - GMCA Culture Fund Investment 2022-2023 ref: 955    Recommendations Approved

Decision Maker: Greater Manchester Combined Authority

Made at meeting: 24/09/2021 - Greater Manchester Combined Authority

Decision published: 28/09/2021

Effective from: 24/09/2021

Decision:

1.            That the allocation of £3.84m (£2.84million district contributions + £1million retained business rates) to create the GMCA Culture Fund Programme 2022/23 be approved.

 

2.            That it be agreed that GMCA Culture Fund investment will roll-forward at the same level and supporting the same portfolio of organisations as in 2020/21 and 2021/2 for the next financial year – 2022/3, subject to organisational health checks on all portfolio organisations prior to funding.

 


24/09/2021 - Greater Manchester Civic University Agreement ref: 954    Recommendations Approved

Decision Maker: Greater Manchester Combined Authority

Made at meeting: 24/09/2021 - Greater Manchester Combined Authority

Decision published: 28/09/2021

Effective from: 24/09/2021

Decision:

1.           That the shared approach by GM’s universities embodied in the Greater Manchester Civic University Agreement (CUA) be noted.

 

2.           That it be noted that the CUA was a high-level framework and symbolic statement of intent, with more specific deliverables needing to follow through the creation of a Civic University Board between the universities and GMCA.

 

3.           That it be noted that the CUA was a living document and can be revisited in light of developments to the Greater Manchester Strategy.

 

4.           That it be noted that, following agreement of the CUA by the GMCA, a public announcement will be made on Monday 27 September 2021.

 


24/09/2021 - Education, Work & Skills Activity Update ref: 953    Recommendations Approved

Decision Maker: Greater Manchester Combined Authority

Made at meeting: 24/09/2021 - Greater Manchester Combined Authority

Decision published: 28/09/2021

Effective from: 24/09/2021

Decision:

1.           That the overall progress set out in the report against a wide range of activity across the Education, Work and Skills Directorate be noted.

 

2.           That authority be delegated to the GMCA Treasurer in consultation with the Portfolio Lead for Education, Work and Skills to agree grant conditions, commissioning route and contract award for the skills bootcamp element of National Skills Fund, as necessary in the event this is devolved.

 

3.            That the progress made to date on the European Social Fund Skills for Growth Programme be noted.

 

4.           That authority be delegated to the Chief Executive Officer, GMCA & TfGM, and GMCA Treasurer to continue with the procurement and contracting of providers and activity relating to the GM Skills for Growth programme in conjunction with the Lead Portfolio Holder

 

5.           That authority be delegated to the Chief Executive Officer, GMCA & TfGM, to award contracts, to address ESF NEET & Youth Unemployment reduction, to the winning bidders following the outcome of the competitive procurement exercise

 

6.           That an amendment to the existing Working Well (Work and Health Programme) contract be approved to include the extension of the Job Entry Targeted Support (JETS) provision /element from March 2022 to March 2023, with an additional investment of £6,737,400 secured from the Department for Work & Pensions (DWP).

 


24/09/2021 - GM Appointments ref: 952    Recommendations Approved

Decision Maker: Greater Manchester Combined Authority

Made at meeting: 24/09/2021 - Greater Manchester Combined Authority

Decision published: 28/09/2021

Effective from: 24/09/2021

Decision:

1.            That the appointment of Cllr Ashley Dearnley to replace Cllr Kathleen Nickson (Rochdale) on the Housing, Planning & Environment Overview and Scrutiny Committee be agreed.

 

2.            That it be noted that Cllr Tracey Rawlins and Cllr Emma Taylor (substitute member), have been appointed by Manchester City Council to the GM Air Quality Administration Committee and Clean Air Charging Authorities Committee.

 


24/09/2021 - Chairs Announcements and Urgent Business ref: 949    Recommendations Approved

Decision Maker: Greater Manchester Combined Authority

Made at meeting: 24/09/2021 - Greater Manchester Combined Authority

Decision published: 28/09/2021

Effective from: 24/09/2021

Decision:

1.           That the concerns of the GMCA regarding the Government’s use of hotels to house asylum seekers and refuges from Afghanistan, and the lack of pre-notification to Local Authorities be noted.

 

2.           That the GMCA call on Government to mandate equitable distribution of asylum seekers and refugees across the UK.

 


24/09/2021 - Apologies ref: 948    Recommendations Approved

Decision Maker: Greater Manchester Combined Authority

Made at meeting: 24/09/2021 - Greater Manchester Combined Authority

Decision published: 28/09/2021

Effective from: 24/09/2021

Decision:

That apologies be received and noted from Salford City Mayor Paul Dennett (Councillor John Merry attending), Joanne Roney, Steven Pleasant (Ian Saxon attending) and Pam Smith (Mark Fitton attending).

 


24/09/2021 - Minutes of the GMCA meeting held on 10 September 2021 ref: 951    Recommendations Approved

Decision Maker: Greater Manchester Combined Authority

Made at meeting: 24/09/2021 - Greater Manchester Combined Authority

Decision published: 28/09/2021

Effective from: 24/09/2021

Decision:


24/09/2021 - Declarations of Interest ref: 950    Recommendations Approved

Decision Maker: Greater Manchester Combined Authority

Made at meeting: 24/09/2021 - Greater Manchester Combined Authority

Decision published: 28/09/2021

Effective from: 24/09/2021

Decision:


17/09/2021 - Minutes of the meeting held 16 July 2021 ref: 940    Recommendations Approved

Decision Maker: Greater Manchester Transport Committee

Made at meeting: 17/09/2021 - Greater Manchester Transport Committee

Decision published: 21/09/2021

Effective from: 17/09/2021

Decision:

That the minutes of the GM Transport Metrolink & Rail Sub Committee meeting held 16 July 2021 be approved as a correct record.

 


17/09/2021 - Declarations of Interest ref: 939    Recommendations Approved

Decision Maker: Greater Manchester Transport Committee

Made at meeting: 17/09/2021 - Greater Manchester Transport Committee

Decision published: 21/09/2021

Effective from: 17/09/2021

Decision:

There were no declarations received in relation to any item on the agenda.


17/09/2021 - Chairs Announcements and Urgent Business ref: 938    Recommendations Approved

Decision Maker: Greater Manchester Transport Committee

Made at meeting: 17/09/2021 - Greater Manchester Transport Committee

Decision published: 21/09/2021

Effective from: 17/09/2021

Decision:

 

There were no Chair’s announcements or items of urgent business.


17/09/2021 - Rail Operator Update ref: 944    Recommendations Approved

Decision Maker: Greater Manchester Transport Committee

Made at meeting: 17/09/2021 - Greater Manchester Transport Committee

Decision published: 17/09/2021

Effective from: 17/09/2021

Decision:

  1. That the update be noted.
  2. That the opportunity to improve accessibility to the car park at Romiley train station be considered at the same time as platform lengthening under the Access for All (AfA) programme.
  3. That an update on proposed timetable changes to be introduced in December 2022 and a report on the consultation exercise be provided at a future meeting of the Sub-Committee.
  4. That Members be made aware of the significant financial challenge of the aspiration to make all GM train stations accessible.
  5. That it be noted that £4m of investment had been committed to install accessible toilets at the majority of Greater Manchester train stations and an indicative timetable be circulated by Northern to Members.
  6. That comments made regarding accessibility and footfall at train stations be considered and that it be noted that Chris Jackson would provide further information to Councillor Tom McGee on the criteria for prioritisation.

 


17/09/2021 - Metrolink Operator Update ref: 942    Recommendations Approved

Decision Maker: Greater Manchester Transport Committee

Made at meeting: 17/09/2021 - Greater Manchester Transport Committee

Decision published: 17/09/2021

Effective from: 17/09/2021

Decision:

  1. That the update be noted.
  2. That Members be advised that KAM were aligned with colleagues and organisations to work in partnership to tackle incidents of crime and ASB and encourage staff to report incidents to support customer safety across the network.
  1. That the update be noted.
  2. That Members be advised that KAM were aligned with colleagues and organisations to work in partnership to tackle incidents of crime and ASB and encourage staff to report incidents to support customer safety across the network.

 


17/09/2021 - Rail Programme and Infrastructure Project Update ref: 945    Recommendations Approved

Decision Maker: Greater Manchester Transport Committee

Made at meeting: 17/09/2021 - Greater Manchester Transport Committee

Decision published: 17/09/2021

Effective from: 17/09/2021

Decision:

  1. That the update be noted.
  2. That a further update be provided to the Sub-Committee at a future meeting on the adoption of a holistic approach to decarbonisation at rail-based Park and Ride locations including the installation of Electric Vehicle Charging points prior to GM becoming a Clean Air Zone on 30 May 2022.
  3. That further information be provided in future updates to the Sub-Committee on not-for-profit social enterprises which form the Greater Manchester rail station alliance. 
  4. That Members be advised that a progress update on the Williams-Shapps Plan for Rail be provided to GMTC at a future meeting.

 


17/09/2021 - Local Rail Service Performance ref: 943    Recommendations Approved

Decision Maker: Greater Manchester Transport Committee

Made at meeting: 17/09/2021 - Greater Manchester Transport Committee

Decision published: 17/09/2021

Effective from: 17/09/2021

Decision:

  1. That the report be noted.
  2. That an update on the progress of the rail industry to address concerns impacting on Sunday services raised by Councillor Angie Clark be provided at a future meeting by Train Operating Companies (TOCs).
  3. That any specific issues relating to the Northern website or app regarding customers being unable to access the £1 ticket sale launched by Northern be reported directly to Chris Jackson.

 


17/09/2021 - Dates and Times of Future Meetings ref: 947    Recommendations Approved

Decision Maker: Greater Manchester Transport Committee

Made at meeting: 17/09/2021 - Greater Manchester Transport Committee

Decision published: 17/09/2021

Effective from: 17/09/2021

Decision:

 

That the following dates and times of future meetings be noted –

 

Friday 12 November 2021

Friday 14 January 2022

Friday 11 March 2022

 

 

All meetings will commence at 10:30am

 


17/09/2021 - Apologies ref: 937    For Determination

Decision Maker: Greater Manchester Transport Committee

Made at meeting: 17/09/2021 - Greater Manchester Transport Committee

Decision published: 17/09/2021

Effective from: 17/09/2021

Decision:

That apologies be noted and received from Councillors Councillor Doreen Dickinson, Joanne Marshall, Howard Sykes (Councillor Angie Clark substituting), Guillaume Chanussot (Keolis Amey) and Lucja Majewski(TransPennine Express).


17/09/2021 - Metrolink Service Performance ref: 941    Recommendations Approved

Decision Maker: Greater Manchester Transport Committee

Made at meeting: 17/09/2021 - Greater Manchester Transport Committee

Decision published: 17/09/2021

Effective from: 17/09/2021

Decision:

  1. That the report be noted.
  2. That the Sub-Committee be advised that the Unite union had confirmed that Metrolink drivers, when balloted, had voted in favour of industrial action in a dispute over pay.
  3. That it be noted that KeolisAmey would continue to work towards an agreement with Unite to prevent strike action on 25 and 26 September, 10 and 24 October, and mitigate any subsequent impact on services to passengers which coincided with a number of significant events in GM.
  4. That TfGM officers would continue to work closely with KAM on contingency provision for the proposed days of industrial action along with measures across the transport network with other providers to mitigate, where possible, the impact on passengers and provide specific communication.
  5. That the detail in relation to two safety incidents which had occurred since the publication of the report in Audenshaw and at Exchange Tram stop be noted and Members be advised that formal investigations had been initiated.
  6. That Members be advised that work was ongoing with the TravelSafe Partnership, GMP and Local Authorities to tackle increased reports of Anti-Social Behaviour and assaults across the Metrolink network.
  7. That it be confirmed that TfGM had received a formal request at the last meeting of Greater Manchester Transport Committee (GMTC), from Councillor Phil Burke for all Metrolink staff to have access to body cameras as a result of increased assaults to staff. This would be considered and reviewed in conjunction with KeolisAmey and further feedback would be provided to all relevant parties.
  8. That the comments from Members regarding crime, ASB and intimidation be noted on the Oldham/Rochdale and East Didsbury line and an increase in operations to combat incidents be requested for the safety of passengers. 
  9. That a further update on matters relating to crime and Anti-Social Behaviour along with details of ongoing targeted work and next steps be reported to the next GMTC meeting.
  10. That a breakdown of patronage across the network on a line-by-line basis be included in future updates to the Sub-Committee.

 


17/09/2021 - GM Transport Committee Work Programme ref: 946    For Determination

Decision Maker: Greater Manchester Transport Committee

Made at meeting: 17/09/2021 - Greater Manchester Transport Committee

Decision published: 17/09/2021

Effective from: 17/09/2021

Decision:

That the proposed work programme for the GM Transport Committee and its Sub Committees be noted.